This 2,000 tons of sand and stone production line project is built in the form of EPC general contract, mainly crushing limestone, the use of hammer crusher as the main crushing equipment, the total investment of the project is $3,508,2303.0830, the annual output value is 6 million tons.
The characteristics of the project are as follows: in the feeding link, the process of soil leakage and pre-screening is adopted; Heavy hammer crusher plus shaping crusher two-stage crushing, high output, high quality of finished products; Pulse bag type dust collector dust treatment, environmental protection standards; Circular storage bin for finished materials, which can realize automatic quantitative loading; The introduction of a full set of mine intelligent management system of Zhongyu Dingli, to achieve intelligent production, management, decision-making data.
Because this is the beginning of cooperation with Zhongyu, we may not be so confident at the beginning, but the patient communication of Zhongyu technical staff, the careful design of the program, the performance advantage of the equipment, and the careful guidance of the production make us firm that we will continue to cooperate with Zhongyu in the future.