We not only improve its capacity but adopt a lot of environmental protection measures. Such as watering the mining area and road, hardening roads, adopting closed bag deduster in crushing station and establishing closed canopy to further reduce dust pollution and optimize production environment.
This production has two heavy hammer crushers, eleven screens, and two ZSJ1218 sand makers; also it is equipped with transfer bin and environmental dedusting equipment. This production line has higher capacity of 600-700 tph than predicted 500tph capacity and has pretty good production effects.