ModelHPC-220
Cavity TypeCF
Feed opening size (mm)22586
Discharge opening size (mm)136
Processing capacity (t/h)150-43090-260
Motor Power (KW)220
Main Unit Weight (t)19
Movable cone diameter (mm)1160

*Note: The processing capacity of the HPC220 cone crusher may vary with different materials and feeding sizes.

Request a quoteMobiles tracked brochure

Our range cone crushers

HP220 Cone Crusher

HP220 Cone CrusherHP220

Nominal capacity90 - 430 t/h

Max. feed size225 mm

Motor power220 kW

Live Chat
HPC200 Cone Crusher

HPC200 Cone CrusherHPC200

Nominal capacity90 - 250 t/h

Max. feed size185 mm

Motor power160 kW

Live Chat
HPC315 Cone Crusher

HPC315 Cone CrusherHPC315

Nominal capacity108 - 610 t/h

Max. feed size290 mm

Motor power315 kW

Live Chat

Case stories

Stone Production Line in Yinchuan Ningxia

At the production site it is seen that by adopting the crusher with hourly capacity of 1200 ton the production process is greatly simplified compared with previous production lines configured with more than one crusher.

600-700TPH Aggregates Production Plant in Sichuan

From this site we get to know this production line builds with mountain that can make fully use of limestone. All the machines are installed and provided by Xinxiang Dingli with high matching.

600TPH Stone Crusher Plant in Nanchang Jiangxi

This 600t/h production line has the basic configuration of PCZ1615 heavy hammer crusher PC1213 hammer crusher ZG1538 feeder 3YKZ2670 vibrating screen*2 sets 2YKZ2670 vibrating screen*2 sets.

Additional product information

HPC-220 Cone Crusher Commissioning Method

Before commissioning the HPC-220 cone crusher, it is necessary to comprehensively check the mechanical components, lubrication and cooling systems, and electrical systems of the equipment to ensure that there are no loose parts, foreign objects, leaks, etc., and that the motor wiring is correct, the insulation is good, and all meters and controllers can work normally.

Empty Load Commissioning

Start the motor and let the equipment run for 2 - 3 hours. Observe its running sound and vibration conditions, and check whether the lubrication and cooling systems are normal and whether the oil temperature, oil pressure, water temperature, and water pressure are stable within the appropriate range, and whether there are abnormal fluctuations in current and voltage.

Load Commissioning

At the initial stage of load commissioning, first add a small amount of materials that meet the equipment feed opening size (225mm for type C and 86mm for type F) at a low feed speed. At the same time, pay attention to the operating state of the equipment and the product particle size. According to the product requirements (the minimum discharge opening of type C is 13mm and that of type F is 6mm), adjust the discharge opening size through a hydraulic adjustment device, etc., and then gradually increase the feed amount to full load (150 - 430t/h for type C and 90 - 260t/h for type F) and run stably for 4 - 6 hours to ensure that the production efficiency, product quality, and energy consumption of the equipment under full load are all normal. If any abnormality occurs, the equipment should be shut down immediately for troubleshooting and resolution.

Contact us

cone crusher
HPC220 Cone Crusher Technical documentation HPC220 Cone Crusher Technical documentation
Always Ready to Serve You

We are present worldwide and always here to help.

Get in touch today!