The project is located in China, put into production in 2019, the main processing material is limestone, the design output is 3000 tons per hour, the annual output is 10 million tons, the production of 0-5, 1-2, 1-3 and other specifications of stone, the total investment of the project is 21069191.2240 US dollars.
This limestone crushing production line project is set up with 4 finished material tanks, equipped with automatic quantitative loading system, automatic weighing system and other intelligent software of mining sand production line.
Due to the topography, there is a long distance between the main engine and the finished material warehouse. Building a 7km belt corridor for me to transport materials is not only more environmentally friendly, but also saves transportation costs.