Hammer crusher manufacturer logo
Contact us
Current Location:Home > News > Corporate

Completed EPC Project in Baisha Hebei

Release Date:2016-11-14Click times:108 Edited by:admin
As a huge gravel production line design and whole set of equipment production industry, Zhongyu Dingli has the ability of EPC in huge gravel production line.

    As a huge gravel production line designer and whole set of equipment production builder, Zhongyu Dingli has the ability of EPC in huge gravel production line. 3000t/h huge aggregates production line in Baisha Hebei, as one of the major EPC projects, has got many concerns of our leaders. Such as, they appointed professional technicians to live in the construction sites and had workers constantly checking the construction ongoing situation. So far, the project has come to an end, there are the construction diagram.

news-baisha-1

Aerial Photography of Whole Production Line

news-baisha-2

Aerial Photography Modernized Full Closed Workshop

news-baisha-3

Aerial Photography of the Front of Production Line

news-baisha-4

Aerial Photography of High Angle Shot of Production Line

      Distance chart of 3000t/h aggregates production line in Baisha Hebei (the crushing, screening, and finished material workshops are all adopted closed-loop system with completed dedusting equipment and occupied few farmland by using of mountain. )

news-baisha-5

Diagram of inlet design of production line (In the front of inlet, there will be an inlet platform and all the materials transported by cars will pour into the material stockpile through the platform.)

news-baisha-6

First crushing equipment of production line (This PCZ2125 hammer crusher, independently researched by our company, is the biggest outputting machine in China with over 2500t/h.)

news-baisha-7

The crushing stone was transported in the full closed workshop for the second crushing and processing.

news-baisha-8

Second crushing equipment in Baisha Production line (Crushing material was sent into this equipment and crushed into qualified finished materials with another secondary crusher.)

news-baisha-9

Another shaping crusher produced by Zhongyu Dingli with simultaneous operation.

news-baisha-16

The dust produced in the process of crushing material was sent into the dedusting equipment that decreased the rates of dust and purified the production environment.

news-baisha-10

Dedusting equipment in both sides of vibrating screen (Deduster, independently designed by Zhongyu Dingli, can deal all the dust in the production that adopted in less than 4m*10m vibrating screen.)

news-baisha-11

V-belt conveyor of production line (It transports finished material into the vibrating screen machine for the second screening.)

news-baisha-12

Finished material stockpile (By using of distributing car, it has higher stock capacity with each 25 thousand tons and totally 100 thousand tons.)

news-baisha-13

Automatic loading system independently researched by Zhongyu Dingli (It can not only transport into the trucks by v-belt but readjust loading speed without moving trucks and using traditional mechanical equipment like fork truck. )

news-baisha-14

Former traditional stone production line of Baisha (With out-of- date production style, it has an obvious contrast with the new one.)

Independently designed by Zhongyu Dingli, provided whole sets of equipment, and installed EPC project, now this production line has a fine construction situation. It is said that this production line, with stone sale and management system, feeding management system, and production management system, is preparing for the final test. This will be another case in Zhongyu Dingli development. And it will enhance building national residential area and advanced units of Baisha, Wuan, Hebei for a bright future.

news-baisha-15

Distance chart of Baisha


More

上一篇:无
下一篇:无