Attention in Joint Design of Crusher and Screener

Release Date:2016-12-29 Click times:94 Edited by:admin
Consultation Inquiry Hotline: 0086-18336065555
Abstract:In combination of crusher and vibrating screen there are permanent, semi-permanent, and moving ways. Now most crushing production lines are used in permanent way.
      There are many crushing line in combining crusher and screener of huge mining, building construction, cement project. Different production lines are with different crushers and screeners and different working principle. Production industry only with single type of machine, now has crushing, screening, and ruling the production line ability. In improving gravel quality, reducing energy consumption, it is very significance. Now we will introduce you joint design of crushing and screening with specific production line.
      As to cement industry crushing line, we should firstly clear the application of finished material and install returning material device under vibrating screen for recycling stone powder. in environmental protection, dust collector is needed to meet green and environmental protection demand.
      In small area stone production line, machine layout should be compact, such as, narrow mining and silo distance, control crusher and screener distance to reduce v-belt conveyor usage.
 
Diagram of compact layout with crusher and screener
      In combination of crusher and vibrating screen there are permanent, semi-permanent, and moving ways. Now most crushing production lines are used in permanent ways that are fixed crusher and vibrating screen near silo with conveyor. While moving production line uses moving crusher. Different locations, finished material demands, stone types will have various production lines.
      Stone production line designed with crushing and screening grading with more vibrating screens and less crushers for high economic costs return.
 