01 Enterprise Dynamics 

From January 6 to 8, 2025, Zhongyu Dingli held the report meeting of "2024 Annual Duty Reporting and Work Summary and 2025 Annual Work Plan." The meeting involved a comprehensive evaluation of the performance of the Group's middle and senior cadres and R&D technicians in 2024, their job competence, and achievement of the annual task objectives. It also included a review of the annual task objectives and work plan for 2025.

2024-Annual-Debriefing.jpg

The evaluation team conducted a thorough evaluation of the job descriptions, assessing them across three key dimensions: "job competence," "task achievement," and "work planning."

Jury-Evaluation.jpg

Zhang Yong, Chairman of the Supervisory Board of the Group, and Zhang Zhimin, Chairman of the Board of Directors, provided full affirmation of the report. They unanimously evaluated the duty report for this year as having data, content, problems, and plans that were real, specific, and systematic. They also gave instructions for the work in the new year.

The-President-and-Chairman-have-provided-guidance-for-the-upcoming-year.jpg

02 Equipment Manufacturing

The production of the mobile belt feeder for the Beichuan project was completed according to schedule. The product was delivered in a timely manner and met the required quality standards.

Equipment Manufacturing.jpg

03 Equipment packages

Our equipment packages enable us to respond quickly to project needs and optimize service. Recently, products were delivered smoothly to the Jinfuxiang, Linxiang, and Fenghuang projects, and the task was successfully completed.

Equipment packages.jpg

 

04 Pre-Sales Service

The pre-sales engineers played an active role in the group's business trips to support projects in Xiaochang, Hubei, Jingyang, Shaanxi, and Leiyang, Hunan. During these trips, they exchanged technical solutions and conducted aerial surveys, contributing to the technical exchanges of the projects in Hubei.

Pre-Sales-Service.jpg

05 EPC Project

The construction of Beichuan Project is progressing well, the steel plate warehouse construction is completed, and the non-standard and steel structure installation is under construction.

Beichuan EPC Project.jpg

06 Production and Operation

Jingmen City Project:

The leaders of Jingmen Ecological Environment Bureau and Jingmen City Control Group visited the Jingmen Project Department to conduct a comprehensive inspection of the project's safety production and environmental hygiene work. During the inspection, the leaders affirmed the work of the project.

Jingmen-City-Project.jpg

Zhenjiang Shaogushan Project:

Focused on overhauling lines, belt equipment, welding fences, and dredging under tanks to provide a safe and good working environment, ensure normal operation of equipment, improve equipment utilization, and ensure stable production and quality.

Zhenjiang-Shaogushan-Project.jpg

Leiyang Minglei Project:

Regular inspection and maintenance of equipment during the production break, inventory and organize materials to make sufficient preparations for the resumption of work; docking the progress of the transformation of the water washing production line to ensure the smooth progress of all work.

Leiyang Minglei Project.jpg

Ningxia Chengfa Project:

Modification of the lower hopper of the return belt in the screening plant to reduce belt wear.

Ningxia-Chengfa-Project.jpg

07 Software Technology

Jiangxi De'an Project Completed the parallel connection of the central control line in the distribution room; Hunan Linxiang Project Successfully completed the installation of bus ducts in low-voltage distribution cabinets, power-on debugging, as well as the production of bridges and cable laying; Ningxia High-Speed Railway Project Debugging of inbound and outbound sales management and automatic car loading system.

Software-Technology.jpg

Software-Technology1.jpg

08 Product R&D

Engineers and workers are working around the clock to ensure that the intelligent tracked loaders for bulk materials can be put into operation as soon as possible.  

Intelligent-loading-equipment.jpg

09 Quality Management

Raw material components are tested in physical and chemical laboratories with specialized equipment to ensure that each batch of raw materials meets high quality requirements and to control product quality from the source.

Quality Management1.jpg

Quality Management2.jpg

10 Tender management

Organize the bidding project of fine sand recovery machine, invite Chen Shukai, executive vice general manager of the Group, and general managers of production and operation centers to participate in the bidding and equipment selection, and strictly control the bidding process to ensure the bidding is fair, effective and smooth.

Financial-Management.jpg

12 Integrated Management

On January 10, the Company participated in the "Deepening School-Enterprise-School-Location Cooperation 'Ten Articles' Release and School-Enterprise-School-Location Project Cooperation Signing Activity" organized by Xinxiang Municipal Party Committee and Municipal Government, reported the situation of school-enterprise cooperation, research and development direction and demand of enterprises to the Bureau of Industry and Information Technology, and actively participated in school-enterprise-school-location cooperation. School-enterprise-school-county cooperation.

School-Enterprise Cooperation.jpg

Carry out the selection of "2024 Annual Award of Excellence and Priority". The person in charge of each center compared with the evaluation standard, after several rounds of repeated argumentation, and finally proposed to select 18 advanced awards, of which 20 advanced individuals, 9 advanced teams, the public list please all employees of the Group to supervise.

2024-Annual-Merit-Assessment-Exercise.jpg

Prepare the "2024 Annual Commendation and Incentive Conference and 2025 New Year's Eve and Spring Festival Gala Planning Plan", clarify the theme of the two conferences, determine the procedure, arrange the division of labor, prepare the prizes and props, select the programs, and organize rehearsals, so as to be well prepared for the two conferences.

Preparation for Annual Meeting1.jpg

Preparation for Annual Meeting2.jpg

Preparation for Annual Meeting3.jpg

13 Customer Service

Spiral sand washer, vibrating screen, dynamic powder separator, hammer crusher and other mining equipment loading and shipping, professional and efficient service, all-round for the construction and installation of customer projects, escort.