1000TPH Gravel Production Line in Xingyang, Henan

Release Date:2016-11-08 Click times:81 Edited by:1000tph-solution-henan
1000T/H Gravel Production Line in Xingyang, Henan

Project overview

Capacity: single production line with hourly capacity of 1000 ton
Construction party: Jiayu Wanxin Stone Plant in Xingyang
Contractor: Xinxiang Dingli Mining Equipment Co., Ltd.
Construction date: Oct. 18, 2011
Construction address: Xingyang, Henan
Project feature: one of China’s largest production lines with yearly capacity of over 3 million ton
Application: as a new profit growth point, the aggregates are used to produce raw materials for concrete and cement preparation.
Production line configuration: heavy hammer crusher PCZ1620 and PCZ1615, vibrating feeder ZG2038*1 set, circular vibrating screen 3YK3070*3 sets,2YK3070*2 sets

Background

    With the rapid development of China's highway, railway, real estate, water conservancy and other infrastructure construction, the demand for gravel aggregates surges greatly. The original natural gravel resources in terms of quantity and quality are unable to meet the needs of large-scale infrastructure projects, so it has become a general trend that fine artificial sand will replace the natural sand. At present, artificial sand production has become an ascendant industry. The market price of artificial sand is about 30 yuan / ton. Except the pre-site selection, equipment investment and wear parts consumption in the process of production, it basically needs no other funds. By grasping the market opportunity in the right time, Jiayu Wanxin Stone Plant in Xingyang, Henan introduces a large gravel aggregates production line.

Analysis

    1. Process design: it mainly adopts the combined crushing technique with two heavy hammer crushers of Dingli. The closed-loop system formed not only increases the hourly capacity but also guarantees the crushing degree of the aggregates is within the required size range for the particles. In order to ensure the cleanliness of aggregates, the vibrating feeder with the function of soil removing is adopted in the feeding end, which is the first channel. In the back end, the finished materials in line with the application requirements are screened through the screening equipment with reasonable configuration, two in the front and two in the back. Compared with the traditional process of combining jaw crusher with impact crusher, the process using the above equipment has the advantages of light installed capacity, convenient maintenance, less investment and quick effect, and the finished aggregate particles have good shape, high cleanliness and high strength, etc.

    2. Production & installation: it totally takes 2 months to complete the entire production line since Oct 18, 2011 when the contract was signed. The whole procedure includes the process design of entire production line, equipment manufacturing & installation and the final enabling of standard operating procedures.

    3. Investment return: the estimated investment of this production line is less than RMB 10 million. Now it has been put into production and operation. With annually production of fine gravel aggregates of over 3 million ton, it is predicated the full investment can be recovered within half year with outstanding economic efficiency.