100T/H Sand Production Line in Baoshan, Yunnan

Project overview

Capacity:100 tph single production line
Construction party: Longxing Stone Plant in Baoshan, Yunnan
Contractor: Xinxiang Dingli Mining Equipment Co., Ltd.
Construction date: Mar 26, 2011
Construction address: Baoshan, Yunnan
Project features: large capacity with fine gravel aggregates of more than 600,000 ton/year
Application: gravel aggregates are used as new raw materials for concrete and cement preparation. Production line configuration: Dingli’s vibrating feeder ZG1528*1 set, PLF-2600, circular vibrating screen 2YK2460*1 set

Background

With the rapid development of China's highway, railway, real estate, water conservancy and other infrastructure construction, the demand for gravel aggregates surges greatly. The original natural gravel resources in terms of quantity and quality are unable to meet the needs of large-scale infrastructure projects, so it has become a general trend that fine artificial sand will replace the natural sand. At present, artificial sand production has become an ascendant industry. The market price of artificial sand is about 30 yuan / ton. Except the pre-site selection, equipment investment and wear parts consumption in the process of production, it basically needs no other funds. By grasping the market opportunity in the right time, Longxing Stone Plant in Baoshan, Yunnan introduces a 100T/H sand production line.

Analysis

    1. Process design: the 100T/H sand production line of Baoxing Stone Plant in Baoshan, Yunnan, adopts a set of sand making machine manufactured by Zhongyu Dingli. The circular vibrating screen 2YK2460 is used in the back end for screening out the finished materials required for application. The process using the above equipment has the advantages of light installed capacity, convenient maintenance, less investment and quick effect, and the finished aggregate particles have good shape, high cleanliness and high strength, etc.

    2. Production & installation: it totally takes 2 months to complete the entire production line since Mar 26, 2011 when the contract was signed. The whole procedure includes the process design of entire production line, equipment manufacturing & installation and the final enabling of standard operating procedures.