600TPH Gravel Production Line in Nanning, Guangxi

Release Date:2016-11-07 Click times:124 Edited by:600tph-nanning
600T/H Gravel Aggregates Production Line in Nanning, Guangxi

Project Overview

Capacity:600t/h
Construction party: Nanning Stone Plant in Guangxi
Contractor: Xinxiang Dingli Mining Equipment Co., Ltd.
Construction date: July 18, 2011
Construction address: Nanning, Guangxi
Project features: large capacity with fine gravel aggregates of 300,000 ton/year
Application: as a new profit growth point, the aggregates are used to produce raw materials for concrete and cement preparation.
Configuration:  ZG1528 vibrating feeder,  PCZ1615 and PCZ1510 heavy hammer crusher,  3YK2460 circular vibrating screen*2 sets, 2YK2460*2 sets

Background

With the rapid development of China's highway, railway, real estate, water conservancy and other infrastructure construction, the demand for gravel aggregates surges greatly. The original natural gravel resources in terms of quantity and quality are unable to meet the needs of large-scale infrastructure projects, so it has become a general trend that fine artificial sand will replace the natural sand. At present, artificial sand production has become an ascendant industry. The market price of artificial sand is about 30 yuan / ton. Except the pre-site selection, equipment investment and wear parts consumption in the process of production, it basically needs no other funds. By grasping the market opportunity in the right time, Nanning Stone Plant in Guangxi introduces a large 600T/H gravel production line.

Analysis

    1. Process design: it mainly adopts the combined crushing technique with two hammer crushers of Dingli. The closed-loop system formed not only increases the hourly capacity but also guarantees the crushing degree of the aggregates is within the required size range for the particles. In order to ensure the cleanliness of aggregates, the vibrating feeder with the function of soil removing is adopted in the feeding end, which is the first channel. Compared with others, the process using the above equipment has the advantages of light installed capacity, convenient maintenance, less investment and quick effect, and the finished aggregate particles have good shape, high cleanliness and high strength, etc.

    2. Production & installation: it totally takes 2 months to complete the entire production line since Jul 18, 2011 when the contract was signed. The whole procedure includes the process design of entire production line, equipment manufacturing & installation and the final enabling of standard operating procedures.